LONDON: Badsworth Road
MAJOR VOID CONTRACT, SOUTHWARK COUNCIL
The structures of the dwelling were in a poor condition. Works include demolishing the entire back extension section due to large diagonal cracks in the external walls and ground movements. Major refurbishment including new roof, electrical and plumbing works also included in the contract.
After a structural survey, the Council instructed us to rebuild the double storey addition at the back of the dwelling.
